2020年7月10日星期五

Subway Muck treatment Plant in Tunneling


The Video is from Subway Muck treatment Plant in China. the Subway muck or Tunneling Slurry in subway constraction can be separated by the Subway Muck Treatment Plant or Tunneling Slurry Treatment Plant. Brighgway Solids Company is provider of the Slurry/muck Treatment Plant. and can be customerized the Slurry/muck Treatment Plant in subway constraction or Tunneling constraction. Know more infromation, please visit the page: www.slurrytreatmentplant.com

2017年7月17日星期一

River Sludge Dewatering System Manufacturer in China

As Sludge Dewatering System Manufacturer in China, Brightway a series of river sludge dewatering system designed and produced for a customer in shandong province has been running for half a year. At present, the efficiency of dewatering of the equipment has exceeded the original design expectation and has been well received by the construction unit.

Traditionally, River Sludge Dewatering System is mainly used in press filter and dewatering centrifuge. Compared with the traditional rive sludge dewatering scheme, The biggest innovation of Brightway river sludge dewatering system is to apply the traditional mud solid control equipment to precessing the river sludge and also configured Programmable Logic Controller system. The whole system is in the leading position in the whole river silt dewatering system and equipment field and in controllability and intellectualization. The whole river sludge dewatering system is far superior to the conventional dewatering centrifuge scheme in the efficiency of processing.


Although, in the aspect of economic investment, new type of river sludge dewatering equipment is expencive than the traditional dewatering equipment, from the perspective of time cost considerations, but the new river sludge dewatering system is the best chiose because of its high processing efficiency, significantly speed up the construction schedule. it will be also a new trend of the river sludge in the future!

Sludge Dewatering System Manufacturer http://www.solidscontrolsystem.com/dredge-dewatering-system-in-river-controling/

2017年3月17日星期五

Well-received of Brightway Technical Services Team in Thailand

For days, Brightway Technical Services Team have been particularly well received on site of Horizontal Directional Drilling Construction in Thailand. This service items is the 350GPM Mud recovery system, which was manufactured by Brightway in January of this year. Service period is 15 days.Brightway team will provide the Training and guidance services of Installation, operation, debugging etc.



This 350GPM Mud recovery system is composed of BWZS103 shale shaker, BWZJ1S8N mud cleaner,centrifugal pumps,mud tank,mud jet mixer and other auxiliary equipment. The system will be macthed with Vermeer D220x300 Horizontal Directional Drilling Rig and used to process the mud from HDD construction. The system has been sent to Thailand successfully  on January 25 of this year.

For days, Brightway enthusiastic and professional services is very impressed with local clients and staffs. At present,The assembly and debugging of system has been finished. Mud recovery system will be running the end of this month.

2017年2月26日星期日

Slurry Treatment Plant for Pipe-jacking Construction

The mud from the pipe jacking construction need to be treated. The treatment solution adopted widely is slurry treatment plant. As the famous manufacturer of slurry treatment plant. In field of Micro-tunneling, pipe-jacking construction, Bored pile and river dredging, Brightway can manufacture different capacity slurry treatment plant, such as 120m³,150m³,180m³,220m³,250m³、300m³、500m³、1000m³ slurry treatment plant, for matching different diameter pipe jacking machine or shield tunneling machine.

CASES OF Slurry Treatment Plant for Pipe-jacking Construction: Brightway one set of slurry treatment plant for pipe-jacking construction has been assembled completely and would be sent to Italy. The capacity of the slurry treatment plant is up to 250m³/h. The slurry treatment plant will be applied to pipe-jacking construction for sewage treatment.

Slurry Treatment Plant for Pipe-jacking Construction


The slurry treatment plant is composed of double-deck shale shaker with stainless steel shaker screen, A set of combination desand hydrocyclone and desilter hydrocyclone, gravel pumps and other auxiliary equipment. the capacity is up to 250m³/h. In the design, The system is very compact so as to removed conveniencely and save site area. It can meet the needs of pipe-jacking construction. Humanized escalators and highlighted lighting so as to operat safely at night. The customer is very satisfied with equipment production and humanized design.

Welcome to visit Brightway factory to discuss cooperation!
More Slurry Treatment Plant information : http://www.solidscontrolsystem.com/slurry-treatment-plant/








2017年1月23日星期一

Triplicate Shale Shaker for The Offshore Drilling Platform

Triplicate shale shaker for the offshore drilling platform was shipped to the Singapore and the capacity is up to 360 m3/h meeting requirement of mixing and processing the drilling mud. The triplicate shale shaker is composed of three sets of BWZS103 mud shale shakers with three composite material corrugated shaker screens. The capacity is up to 360 m3/h.

Triplicate Shale Shaker Shipped


Brightway Solids Control BWZS series shale shaker has four characters, such as large capacity, stable performance, convenient operation, long service life, etc. also  Brightway can design and manufacture the Drying shaker, Double-deck shale shaker, Triplicate Shale Shaker according to the customer's requirements. In addition, Brightway shale shaker can interchange with the the international famouse mud shaker.

Triplicate Shale Shaker: http://www.solidscontrolsystem.com/product-item/shale-shaker/





2017年1月6日星期五

Multistage Automatic Solids Control System for The River Channel Dredging

On 2nd January, After more than a month of production, Brightway two sets of multistage automatic solids control systems have been assembled and commisioned successfully and would be sent to the site of the river channel dredging. The system  is designed and manufactured for the field of river channel dredging. and it can acheive separation control and recovery step by step.

Multistage Automatic Solids Control System for The River Channel Dredging


The system is composed of four BWZS104 shale shaker, one set of cyclone desander and other centrifugal pumps. All equipment adapt famous brands domestic and international. These equipment can be fitted up freely according to the need of site. And it can meet requirement of different treatments. The system is integrated with PLC (Programmable Logic Controller) device and reduces human cost greatly. the system max capacity is up to 300m3/h and can separate coarse sand, fine sand from river mud effectively.

In the field of river channel dredging, Brightway accumulated a lot of successful cases and more operating experience. Considering the big mud content and difficult environmental management in the proccess of river channel dredging, Brightway is aimed to design and research a integration solution in order to save a lot of cost for customer. At present, According to the working condition of river silt the customer provided, Brightway can design and configurate different model multistage automatic solids control equipment or system to meet requirements of different customers, including BWQY-120 (120m3), BWQY-240(240m3), BWQY-300(300m3),  BWQY-450(450m3), BWQY-600(600m3).


2016年12月14日星期三

50m3/h HDD Recycling System

This year Brightway get glorious achievement in HDD field, which benefits from keeping learning and improving all the time. Last week brightway just sent one set 50m3/h recycling system to an old client. That client purchased one set 500GPM recycling system last year, which matches with 450T rig and supports client to successfully finish a lots project at local market. So this year, gaveling us second system order to match with them good Chinese brand 100T rig.

50m3/h HDD Recycling System


Brightway is not just focus on recycling system---HDD field, but also separation plant—Micro-tunneling field, solids control system---oil&gas field and so on.

Brightway strive to solve all discharge solids problem in all kind of field. Welcome to get your call, inquiry and consultation. http://www.solidscontrolsystem.com/portfolio-item/hdd-mud-system/